Electric Service Requirements (ESR)
The information contained on this page comprises the Electric Standards Requirements book distributed by ¶¶ÄÌÊÓƵ as a reference and a guide for regulations and practices regarding the connection and supply of electric service for ¶¶ÄÌÊÓƵ and UES Santa Cruz County.
For more information, see .
Jump to a section:   Quick Access |  Standards |  DGIRs
Quick Access
Online ESR
Download the annual print-version . (published January 2024)
Please Note: The printed version does not include revisions past the yearly publication date.
View or Download
Standards
General Information – 100
Number | Title |
---|---|
Title Block and Logos | |
Important Contact Information | |
One Call — Bluestake, Tree Trimming and Overhead Protection | |
Definitions | |
Application for Service | |
Type of Service & Limitations | |
Preliminary Notification | |
Obtaining Information | |
Residential/Commercial New Construction | |
Application for Removal | |
Service, Power Kill and Access Scheduling | |
Scheduling Reminders | |
Access to Company Pad Mounted Equipment | |
Power Kill Request | |
Line Extensions | |
Qualifications for Three-Phase Service | |
Overhead Line Extensions | |
Underground Line Extensions | |
Subdivision Line Extensions (Single & Three Phase Requirements) | |
High Density Development Designs | |
Additional Charges | |
New Subdivisions - Provisions for Service | |
New Subdivisions - Ducts for Road Crossing | |
Rights-of-Way and Easements | |
Rights-of-Way | |
Registered Land Surveyor Information | |
Legal Description | |
Exhibit Drawing | |
Electronic File for Easement | |
Outline for Project Completion, Residential & Commercial | |
Additional Information | |
Codes & Regulations | |
Customer Installations | |
Access to Premises | |
Employee Identification | |
Protection of Company Property | |
Customer's Equipment | |
Interruptions | |
Defaults | |
Resale of Energy | |
Attachments to Company Facilities | |
Energy Diversion | |
Un-metered Energy |
Civil Installations– 200
Number | Title |
---|---|
Duct and Concrete Installation | |
Tracer Wire Installation, 46kV Underground | |
Trench, Backfill | |
Site Preparation for Equipment Pads on Sloping Grades | |
Trenching, Underground Residential Distribution (URD) | |
Sleeve Installation | |
Trench and Duct Encasement, Drainageway Crossings | |
Trenching 2.5-inch, 4-inch, and 6-inch Conduit Installation | |
Duct Stub Detail | |
Underground Riser, Customer Installed | |
Distribution Pullbox with Manhole | |
Pullbox 15 kV with Lid (Reference Only) | |
Equipment Barrier, Protective | |
Excavation and Duct Placement for 3-Phase Fused Junction Cabinet (F2) | |
Transformer Pad Underground 3-Phase | |
Excavation and Duct Placement for 3-Phase Junction Cabinet (J2) | |
Excavation and Duct Plasement for 1-Phase Junction Cabinet (J1) | |
Excavation and Duct Plasement for 3-Phase Junction Cabinet (J6) | |
Excavation and Duct Placement for Switchgear Box Pad (PME) | |
Excavation and Duct Placement for Pad-Mounted Capacitor | |
Excavation and Duct Placement for Gas Insulated Switchgear Box Pad (Vista) | |
Equipment at Grade in Open Air Alcove |
Service Installations – 300
Number | Title |
---|---|
Entrance Facilities: Load Balancing, Typical Service Entrances, Socket Wiring | |
Electric Service Lines: Overhead Service Lines, Underground Service Lines, Service Trenches | |
Overhead or Underground Service and Meter Location | |
Service Entrance with Conduit Riser Overhead | |
Service Entrance on a Pole | |
Three-Phase Underground Service from Overhead, 600A or Less | |
Single-Phase Underground Service from Overhead, 400A | |
Three-Phase Underground Service from Pad-Mounted Transformer | |
Service Entrance Underground | |
Trenching, Service Single-Phase | |
Service Entrance Temporary, Underground |
Metering Installations – 400
Number | Title |
---|---|
General Requirements | |
Definitions | |
Requirements for Residential Socket Interiors | |
Meter Enclosures and Clear Working Space | |
Residential or Commercial (Restricted) Service 0-100A, 3W, 1Ø, Overhead and 0-30A, 2W, 1Ø Overhead or Underground | |
Residential Overhead Service, 3W, 1Ø, 101-200A | |
Residential Underground Service, 3W, 1Ø, 0-200A | |
Residential Service, 3W, 1Ø, 0-200A Combination Meter Socket and Distribution Section | |
Meter Post - Underground Service to Mobile Home | |
Service Pedestal for Use in Common Public Area & Right-of-Way, 0-200A, 0-600V | |
Commercial Service, 3W or 4W, 1Ø and 3Ø, 0-200A | |
Residential or Commercial Service, 3W, 1Ø, 201-400A | |
Socket Requirements - 1Ø w/Instrument Transformers | |
Socket Requirements - 3Ø w/Instrument Transformers | |
Residential and Commercial Multi-Metering Installations | |
Residential, High-Rise Building, Individually Metered Units | |
Meter Protective Cabinets | |
Current Transformer Installations in Cabinets | |
Meter Socket and Conduit Installation Detail for Primary Metered Service | |
Remote Meter Cabinet for primary metered service, 201 - 800A | |
Terminating Box or Section | |
Combination Terminating Box and Main Disconnect | |
Commercial CT Power and Control Cabinet, 400-800A | |
Current Transformer Installations in Switchgear | |
Metering Remote | |
Low Profile Switchboards | |
CT Compartment, 401-800A, 1Ø | |
CT Compartment, 201-1000A, 3Ø | |
CT Compartment, 1001-3000A, 3Ø | |
CT Compartment, 3001A-4000A, 3Ø | |
Enclosed Meter Panel in Raintight Switchgear | |
Switchboard Meter Panels | |
Removable Bus Links and CT Supports | |
Primary Metering Overhead and Underground | |
Approved Metering and Service Equipment |
Short Circuit Protection – 500
Number | Title |
---|---|
Short Circuit Protection |
Grounding and Bonding– 600
Number | Title |
---|---|
General Information, Introduction, NFPA 70 NEC, Grounding, Bonding (Unfused Areas) | |
Minimum Size of Bonding/Equipment Grounding/Grounding Electrode Conductors and Grounding Bus | |
Concrete Encased Electrode (Ufer Ground) | |
Single Phase Meter Pedestal | |
Single Phase Overhead Residential Service (Meter Socket and Load Center) | |
Single Phase Overhead or Underground Service (All in One) | |
Single Phase Overhead or Underground (Multi-Pak Service) | |
Single or Three Phase Overhead Service(Meter Socket and Disconnects) | |
Three-Phase Service Overhead or Underground (Pull Section, Raceway and Sockets) | |
Transformer Rated Service With CT CAN Overhead or Underground | |
Transformer Rated Service Switchgear Overhead or Underground |
Customer Technologies - 700
Number | Title |
---|---|
Installation and Operation of Interconnected Distributed Generation Sources (Including Emergency and Standby Systems) | |
Electric Service Requirements For Small Interconnected Distributed Generation Sources | |
Electric Service Requirements For Medium-Sized Commercial Interconnected Distributed Generation Sources | |
Metering Requirements for Distributed Generation Facilities Larger Than 300kW | |
Backup Generator Connection Requirements | |
Interconnection Requirements – Distributed Energy Storage Systems, Single-Phase |
Telecommunication, Wireless & Cable TV Pole Attachments - 800
For complete information, visit the Telecommunication Pole Attachments page.
Number | Title |
---|---|
General Attachment Specifications | |
Pole Details | |
Anchor & Guying Details | |
Telecommunications and Fiber Identification | |
Pole Mounted Small Cell Equipment | |
Stranded Mounted Small Cell Equipment | |
Service Entrance on Customer Owned Small Wireless Facility (SWF) or Light Pole | |
Riser Details, Telco/CATV |
Clearances - 900
Number | Title |
---|---|
Design Principles for Overhead Distribution Lines Near Public Facilities | |
Service Entrance Clearance from Gas Meter Regulator or Extension Vent |
GIS Drawing Legend
Number | Title |
---|---|
Overhead/Underground Mapping Legend |
Distributed Generation Interconnection Requirements (DGIRs)
View and download the DGIRs.